Building Infrastructure Equipment
COMPLIANCE + OPERATIONS
Layered approach to ensuring safety moves from design and installation to routine hazard surveillance.
BIOMEDICAL
Pre- and post-procurement activities to help optimize purchases and installation .
BIOMEDICAL
Key departments to loop into the purchasing process.
BIOMEDICAL
Planning, purchasing and installing new technology takes meticulous planning and collaboration.
COMPLIANCE+OPERATIONS
The facility engineer’s often overlooked role in ensuring patient safety.
INFRASTRUCTURE
Taking advantage of each members' expertise is vital to selecting the right systems for the project.
INFRASTRUCTURE
Integrated project delivery was vital to selecting the right HVAC system to meet the goals of this project.
ENGINEERING
Measuring the environmental quality indicators in a dynamic hospital operating room setting.
INFRASTRUCTURE
Not all facilities are created equal when it comes to HVAC system optimization.
INFRASTRUCTURE
Optimizing HVAC system output can help to reduce energy and water bills.